Town of Marana issued the following announcement on Dec. 27.
On December 12th, the Water Infrastructure Finance Authority of Arizona (AZWIFA) approved the offer of a $15 million loan to the Town of Marana to address the issue of unregulated compounds. The final loan agreement documents with AZWIFA will be brought to the Marana Town council most likely in January 2019 for final acceptance.
Marana Water has selected and is currently negotiating a contract with a design engineering firm to begin the process of design for the two advanced water treatment plants. Each water system (Picture Rocks and Airline/Lambert) will have a treatment plant designed and constructed to significantly reduce or remove the discovered unregulated compounds (PFCs and 1,4-Dioxane).
Original source can be found here.